Crystal T-1-CPF Hydraulic Comparator Manual de usuario Pagina 13

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 25
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 12
Operation and Maintenance 11
Type T Pump Operation Manual
12 Slowly pump two and one-half strokes, positioning the pump lever at approximately 45 degrees, halfway through its stroke.
13 Allow system uid to ow out of the high pressure check valve, ushing entrapped air.
14 Examine the port for air bubbles which may adhere to the threads or parts.
Note: If air bubbles are present, repeat steps 12 through 14 until no more air bubbles appear.
15 Replace the high pressure/low volume check valve plug and tighten partially.
16 Use slight pressure on the hand lever to push system uid past the high pressure/low volume check valve plug to ensure complete purging of the
valve port.
17
Tighten the high pressure/low volume check valve plug.
18 Operate the pump handle until pumping becomes dicult.
19 Raise the pump handle.
20 Push in the valve rod selector to the high pressure/low volume position.
21 Resume pumping to verify the pump is operating properly.
Note: If the high pressure/low volume setting does not operate properly, there is more air trapped in the high pressure/low volume check valve. The priming
procedure must be repeated.
Vista de pagina 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 24 25

Comentarios a estos manuales

Sin comentarios